The tenth Assembly of Partners of GWP West Africa held on September 2021 in Ouagadougou, Burkina Faso on the theme "Covid-19 Crisis Response Strategy for Water Security and Sustainable Development in West Africa”.
The West Africa partners have approved the designation of Mr. Abdoulaye SENE as the new chair of Global water Partnership West Africa. He is replacing Professor Amadou Hama MAIGA whose second mandate ended. This one of the main decisions of the 10th Assembly of Partners of GWP-WA held on 29 September 2021 in Ouagadougou.
The Country Water Partnership of Guinea (PNEGUI) took part on September 30, 2021, in the scoping workshop for the development of the national action plan for integrated water resources management (PAGIRE).
An assessment report on the status of Hygiene and Basic sanitation (HBS) in Benin from 2010 to 2020 shows that the Government is paying less attention to HBS compared to the water subsector and the ministry of Health is not doing the required actions. This report was validated by the twenty participants, actors of the sector and coming from various horizons to the workshop organized for this purpose, on September 24, 2021.
The regional workshop for the start-up of the study mission on "carrying out a prospective diagnosis of the Fouta Djallon Massif together with the analysis of opportunities and the proposal of options/priorities for the restoration of the degraded ecosystems of the Highlands held on 22 September 2021 in Bamako.
The project « Integrating flood and drought management and early warning for climate change adaptation in the Volta Basin (VFDM) » financed by the Adaptation Fund held the remaining two training sessions in the series of six in the Volta basin countries.
The Consortium comprising the World Meteorological Organization (WMO), a specialized United Nations agency, the Volta Basin Authority (ABV) and the Global Water Partnership in West Africa (GWP-WA) are implementing the project entitled "Integration of flood and drought management and early warning for adaptation to climate change in the Volta Basin (VFDM)". The activities of the VFDM project, started in June 2019, are continuing and will end at the end of June 2023. The VFDM project is financed by the Adaptation Fund.
The Consortium, comprising the World Meteorological Organization (WMO), the Volta Basin Authority (VBA) and the Global Water Partnership in West Africa (GWP-WA), organized from 02 to 04 August 2021 in Bobo-Dioulasso in Burkina Faso, the first of a series of eight (8) national training workshops on "Mainstreaming gender into the end-to-end early warning system for flood forecasting and integrated flood risk management in the Volta Basin”. This was followed by the holding of the Decision-makers' Day on Thursday, August 5, which focused on the same theme in Bobo Dioulasso.
A two-day national capacity building workshops on the development of flood and drought risk maps in the Volta Basin were held in each Volta basin country with the last one in Accra, Ghana on 5 and 6 July 2021.