Kazakhstan
All actions for Kazakhstan
Kazakhstan
- Institutions and Participation
Action 1 - To intensify the work of the Inter-ministerial Council on water resources management established by the Government of Kazakhstan
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1a. National institutions
Level: National
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: National Security Council of Kazakhstan; Ministry of Agriculture
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.1a. National institutions
Level: National
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: National Security Council of Kazakhstan; Ministry of Agriculture
Timeline for implementation: 2019-2020
Kazakhstan
- Institutions and Participation
Action 2 - Enhance the status of the national water management authority
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1a. National institutions
Level: National
Status of action: Underway
Related SDG Goal: 6. Clean water and sanitation, 16. Peace, justice and strong institutions
Responsible Agency: Ministry of Agriculture (Ministry of Environment)
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.1a. National institutions
Level: National
Status of action: Underway
Related SDG Goal: 6. Clean water and sanitation, 16. Peace, justice and strong institutions
Responsible Agency: Ministry of Agriculture (Ministry of Environment)
Timeline for implementation: 2019-2020
Kazakhstan
- Institutions and Participation
Action 3 - To enhance the status of river basin organizations (inspections)
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.B WASH local participation
Responsible Agency: CWR; Balkash-Alakol; BWI
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.B WASH local participation
Responsible Agency: CWR; Balkash-Alakol; BWI
Timeline for implementation: 2019-2020
Kazakhstan
- Institutions and Participation
Action 4 - To enhance the status of Public Basin Councils (BC)
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.A WASH cooperation and capacity building
Responsible Agency: CWR
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.A WASH cooperation and capacity building
Responsible Agency: CWR
Timeline for implementation: 2019-2020
Kazakhstan
- Institutions and Participation
Action 5 - Strengthening the human resources capacity of CWR and BWI
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1e. Developing IWRM capacity
Level: National
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.1e. Developing IWRM capacity
Level: National
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 6 - Improvement of technical and financial base of CWR and BWI
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: MA, CWR, BWI, River basin council
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: MA, CWR, BWI, River basin council
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 7 - Increase the level of staff's training and retraining
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1e. Developing IWRM capacity
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: Ministry of Education, МA, Мinistry of Economy (ME), МFA
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.1e. Developing IWRM capacity
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: Ministry of Education, МA, Мinistry of Economy (ME), МFA
Timeline for implementation: 2019-2025
Kazakhstan
- Management Instruments
Action 8 - Equipment of laboratories for accounting and analysis of water quantity and quality
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse
Responsible Agency: CWR, BWI
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse
Responsible Agency: CWR, BWI
Timeline for implementation: 2019-2025
Kazakhstan
- Enabling Environment
Action 9 - Adopt a new Water Code as many recent amendments have complicated, confused and worsened the management of water resources
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.1c. National IWRM plans
Level: National
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building, 16. Peace, justice and strong institutions
Responsible Agency: CWR, BWI, River Basin Council
Timeline for implementation: 2020
SDG 6.5.1 Question: 1.1c. National IWRM plans
Level: National
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building, 16. Peace, justice and strong institutions
Responsible Agency: CWR, BWI, River Basin Council
Timeline for implementation: 2020
Kazakhstan
- Institutions and Participation
Action 10 - To increase the status of SKIOVR (River basin strategic plan) as the basic document for planning economic activities in a basins according to IWRM and the SDGs
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building
Responsible Agency: CWR, BWI
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.2a. Basin/aquifer organizations
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building
Responsible Agency: CWR, BWI
Timeline for implementation: 2019-2020
Kazakhstan
- Enabling Environment
Action 11 - To clarify the procedure of work with new (planned) projects (coordination of the projects, service or function state)
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.2d. Sub-national regulations
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 1.2d. Sub-national regulations
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR
Timeline for implementation: 2019-2020
Kazakhstan
- Enabling Environment
Action 12 - To improve specific norms of water use: standards of public services (article 66 of Water Code)
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.1c. National IWRM plans
Level: National
Status of action: Underway
Related SDG Goal: - 6.1 Safe drinking water, - 6.4 Water efficiency
Responsible Agency: CWR
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 1.1c. National IWRM plans
Level: National
Status of action: Underway
Related SDG Goal: - 6.1 Safe drinking water, - 6.4 Water efficiency
Responsible Agency: CWR
Timeline for implementation: 2019-2020
Kazakhstan
- Management Instruments
Action 13 - To introduce a complete ban on discharges into water bodies and the environment without treatment and the required standards
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1b. Sustainable, efficient use management
Level: National
Status of action: Underway
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse
Responsible Agency: CWR
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 3.1b. Sustainable, efficient use management
Level: National
Status of action: Underway
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse
Responsible Agency: CWR
Timeline for implementation: 2019-2020
Kazakhstan
- Management Instruments
Action 14 - Restore the function and power of the BWI on the use of groundwater
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.2b. Aquifer management instruments
Level: Sub-national
Status of action: Underway
Related SDG Goal: 6. Clean water and sanitation
Responsible Agency: CWR
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 3.2b. Aquifer management instruments
Level: Sub-national
Status of action: Underway
Related SDG Goal: 6. Clean water and sanitation
Responsible Agency: CWR
Timeline for implementation: 2019-2020
Kazakhstan
- Management Instruments
Action 15 - Restore the status of groundwater as a strategic resource
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.2b. Aquifer management instruments
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 3.2b. Aquifer management instruments
Level: Sub-national
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR
Timeline for implementation: 2019-2020
Kazakhstan
- Institutions and Participation
Action 16 - Analysis of national, sectoral and territorial development strategies according to IWRM and SDG principles
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1b. Cross-sectors coordination
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.B WASH local participation, 17. Partnerships for the goals
Responsible Agency: CWR, Health Ministry
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.1b. Cross-sectors coordination
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.B WASH local participation, 17. Partnerships for the goals
Responsible Agency: CWR, Health Ministry
Timeline for implementation: 2019-2020
Kazakhstan
- Enabling Environment
Action 17 - Update of water use standards and regulations
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.1a. National policy
Level: National
Status of action: Underway
Related SDG Goal: - 6.1 Safe drinking water
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 1.1a. National policy
Level: National
Status of action: Underway
Related SDG Goal: - 6.1 Safe drinking water
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2020
Kazakhstan
- Enabling Environment
Action 18 - Update and implementation of specific water use standards
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.1a. National policy
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.1 Safe drinking water
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 1.1a. National policy
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.1 Safe drinking water
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2020
Kazakhstan
- Financing
Action 19 - Update of tariff policy (as the current "common tariffs" - insufficient to cover costs and investments)
IWRM Dimension:
Financing
SDG 6.5.1 Question: 4.2b. Revenues raised for IWRM elements
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, МNE
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 4.2b. Revenues raised for IWRM elements
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, МNE
Timeline for implementation: 2019-2020
Kazakhstan
- Management Instruments
Action 20 - Implementation and dissemination of the best available technologies to save water and reduce pollution
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1c. Pollution control
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse, - 6.4 Water efficiency
Responsible Agency: МА, ME, BWI and River basin council, NGO
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 3.1c. Pollution control
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse, - 6.4 Water efficiency
Responsible Agency: МА, ME, BWI and River basin council, NGO
Timeline for implementation: 2019-2020
Kazakhstan
- Management Instruments
Action 21 - Changing the structure of production and replacement of water-intensive industries (rice and cotton)
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.4 Water efficiency, 12. Responsible consumption and production
Responsible Agency: MA, CWR, other water users
Timeline for implementation: 2019-2030
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.4 Water efficiency, 12. Responsible consumption and production
Responsible Agency: MA, CWR, other water users
Timeline for implementation: 2019-2030
Kazakhstan
- Management Instruments
Action 22 - Water saving programs in irrigated agriculture; reduction of water losses in municipal water supply; reduction of water consumption and waste water in industry
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Underway
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse, - 6.4 Water efficiency, 12. Responsible consumption and production
Responsible Agency: MA, CWR, other water users
Timeline for implementation: 2019-2030
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Underway
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse, - 6.4 Water efficiency, 12. Responsible consumption and production
Responsible Agency: MA, CWR, other water users
Timeline for implementation: 2019-2030
Kazakhstan
- Management Instruments
Action 23 - Conservation and restoration of aquatic ecosystems to support environmental sustainability
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1d. Ecosystems management
Level: National
Status of action: Underway
Related SDG Goal: - 6.6 Water-related ecosystems, 14. Life below water, 15. Life on land
Responsible Agency: MA, CWR, other water users
Timeline for implementation: 2019-2030
SDG 6.5.1 Question: 3.1d. Ecosystems management
Level: National
Status of action: Underway
Related SDG Goal: - 6.6 Water-related ecosystems, 14. Life below water, 15. Life on land
Responsible Agency: MA, CWR, other water users
Timeline for implementation: 2019-2030
Kazakhstan
- Management Instruments
Action 24 - Pilot project on formation of new model of basin management on the basis of IWRM principles on the example of the Balkhash-Alakol Lake basin
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.2a. Basin management instruments
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building
Responsible Agency: Ministry of agriculture in collaboration with industry and territorial bubbled bodies
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 3.2a. Basin management instruments
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building
Responsible Agency: Ministry of agriculture in collaboration with industry and territorial bubbled bodies
Timeline for implementation: 2019-2025
Kazakhstan
- Management Instruments
Action 25 - Improve the monitoring of water quality and quantity
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.2c. Data sharing (in country)
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse, - 6.4 Water efficiency
Responsible Agency: CWR, ME, Hydromet, Comgeo and SES
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 3.2c. Data sharing (in country)
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.3 Water quality, treatment, safe reuse, - 6.4 Water efficiency
Responsible Agency: CWR, ME, Hydromet, Comgeo and SES
Timeline for implementation: 2019-2025
Kazakhstan
- Management Instruments
Action 26 - Inventory of catchment areas and runoff formation zones (including small and medium rivers)
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Underway
Related SDG Goal: 6. Clean water and sanitation
Responsible Agency: CWR, ME, Hydromet, Committee of Geology
Timeline for implementation: 2020-2025
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Underway
Related SDG Goal: 6. Clean water and sanitation
Responsible Agency: CWR, ME, Hydromet, Committee of Geology
Timeline for implementation: 2020-2025
Kazakhstan
- Management Instruments
Action 27 - Improve water accounting system
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Awaiting funding
Related SDG Goal: 6. Clean water and sanitation
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 3.1a. Water availability monitoring
Level: National
Status of action: Awaiting funding
Related SDG Goal: 6. Clean water and sanitation
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2020
Kazakhstan
- Institutions and Participation
Action 28 - Involvement of NGOs and water users in policy and the work of the commissions, working groups, other forms of participation of NGOs
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1c. Public participation - national
Level: National
Status of action: Awaiting funding
Related SDG Goal: 17. Partnerships for the goals
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.1c. Public participation - national
Level: National
Status of action: Awaiting funding
Related SDG Goal: 17. Partnerships for the goals
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 29 - Programs of support and development/ establishment of “water” NGOs
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1c. Public participation - national
Level: National
Status of action: Underway
Related SDG Goal: 17. Partnerships for the goals
Responsible Agency: BWI, River basin council
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.1c. Public participation - national
Level: National
Status of action: Underway
Related SDG Goal: 17. Partnerships for the goals
Responsible Agency: BWI, River basin council
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 30 - To restore/ improve the system of education in Universities and Colleges on water specialties
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1e. Developing IWRM capacity
Level: National
Status of action: Awaiting funding
Related SDG Goal: 6. Clean water and sanitation, 17. Partnerships for the goals
Responsible Agency: Ministry of Education, MA
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.1e. Developing IWRM capacity
Level: National
Status of action: Awaiting funding
Related SDG Goal: 6. Clean water and sanitation, 17. Partnerships for the goals
Responsible Agency: Ministry of Education, MA
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 31 - Low involvement of youth and women. Taking their needs into account when planning and implementing programs
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2d. Gender inclusion in laws/plans
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: 5. Gender equality, - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.2d. Gender inclusion in laws/plans
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: 5. Gender equality, - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, BWI, River basin council
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 32 - Analysis of knowledge needs for the implementation of IWRM, including for women and youth
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2d. Gender inclusion in laws/plans
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: 5. Gender equality, - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, BWI
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.2d. Gender inclusion in laws/plans
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: 5. Gender equality, - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: CWR, BWI
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 33 - Development of public - private partnerships for the implementation of IWRM at the national and basin levels
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.1b. Cross-sectors coordination
Level: National
Status of action: Awaiting funding
Related SDG Goal: 17. Partnerships for the goals
Responsible Agency: MA, CWR, BWI
Timeline for implementation: 2029-2025
SDG 6.5.1 Question: 2.1b. Cross-sectors coordination
Level: National
Status of action: Awaiting funding
Related SDG Goal: 17. Partnerships for the goals
Responsible Agency: MA, CWR, BWI
Timeline for implementation: 2029-2025
Kazakhstan
- Financing
Action 34 - Development of financial and economic instruments to improve the investment environment, including public and private investment
IWRM Dimension:
Financing
SDG 6.5.1 Question: 4.2b. Revenues raised for IWRM elements
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.A WASH cooperation and capacity building
Responsible Agency: MA, CWR, BWI
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 4.2b. Revenues raised for IWRM elements
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.A WASH cooperation and capacity building
Responsible Agency: MA, CWR, BWI
Timeline for implementation: 2019-2025
Kazakhstan
- Management Instruments
Action 35 - Analysis of the current situation with scattered and not always available information and databases in the water sector, creation of an integrated database
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.2c. Data sharing (in country)
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: MA, CWR, BWI
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 3.2c. Data sharing (in country)
Level: Sub-national
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: MA, CWR, BWI
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 36 - Strengthening and improving institutions (including IFAS and ICWC)
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2e. Transboundary institutions
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.4 Water efficiency, - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: IFAS, Central Asian countries, Caspian region, other countries
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.2e. Transboundary institutions
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.4 Water efficiency, - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: IFAS, Central Asian countries, Caspian region, other countries
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 37 - Creation, training and support of secretariats, project offices in transboundary commissions
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2e. Transboundary institutions
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: IFAS, CA countries, other countries
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 2.2e. Transboundary institutions
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: IFAS, CA countries, other countries
Timeline for implementation: 2019-2025
Kazakhstan
- Institutions and Participation
Action 38 - Support of the transboundary water center in Kazakhstan and adequate financing of transboundary negotiations and cooperation
IWRM Dimension:
Institutions and Participation
SDG 6.5.1 Question: 2.2e. Transboundary institutions
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: MFA, MA, CWR, Ministry of Finance
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 2.2e. Transboundary institutions
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: MFA, MA, CWR, Ministry of Finance
Timeline for implementation: 2019-2020
Kazakhstan
- Enabling Environment
Action 39 - Joint transboundary action on climate change adaptation, including measures to adaptation of the most vulnerable sectors: water and agriculture, drinking water and ecosystems
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.6 Water-related ecosystems, 12. Responsible consumption and production, 13. Climate action, 17. Partnerships for the goals
Responsible Agency: Intergovernmental Commission on sustainable development, CA countries, other water users
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.6 Water-related ecosystems, 12. Responsible consumption and production, 13. Climate action, 17. Partnerships for the goals
Responsible Agency: Intergovernmental Commission on sustainable development, CA countries, other water users
Timeline for implementation: 2019-2025
Kazakhstan
- Management Instruments
Action 40 - Dissemination of best practices and available technologies for adaptation water sector, agriculture and public utilities and drinking water supply to climate change
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.1b. Sustainable, efficient use management
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.A WASH cooperation and capacity building, 13. Climate action, 17. Partnerships for the goals
Responsible Agency: Intergovernmental Commission on sustainable development, Reserch instutute, NGOs
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 3.1b. Sustainable, efficient use management
Level: National
Status of action: Awaiting funding
Related SDG Goal: - 6.A WASH cooperation and capacity building, 13. Climate action, 17. Partnerships for the goals
Responsible Agency: Intergovernmental Commission on sustainable development, Reserch instutute, NGOs
Timeline for implementation: 2019-2025
Kazakhstan
- Management Instruments
Action 41 - Implementation of automated control, accounting and monitoring systems water resources in transboundary basins
IWRM Dimension:
Management Instruments
SDG 6.5.1 Question: 3.2d. Transboundary data sharing (between countries)
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building
Responsible Agency: IFAS, MFA, MA, CWR
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 3.2d. Transboundary data sharing (between countries)
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, - 6.A WASH cooperation and capacity building
Responsible Agency: IFAS, MFA, MA, CWR
Timeline for implementation: 2019-2025
Kazakhstan
- Enabling Environment
Action 42 - Establishment of a Water and energy consortium as a practical mechanisms to address problems in transboundary basins
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: 6. Clean water and sanitation, - 6.A WASH cooperation and capacity building, 7. Affordable and clean energy, 17. Partnerships for the goals
Responsible Agency: IFAS, MFA, MA
Timeline for implementation: 2020-2021
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Awaiting funding
Related SDG Goal: 6. Clean water and sanitation, - 6.A WASH cooperation and capacity building, 7. Affordable and clean energy, 17. Partnerships for the goals
Responsible Agency: IFAS, MFA, MA
Timeline for implementation: 2020-2021
Kazakhstan
- Enabling Environment
Action 43 - Eliminate dependence of BWO "Syrdarya" and "Amudarya" and SIC ICWC on the host country
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: IFAS, CA countries
Timeline for implementation: 2019-2020
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation
Responsible Agency: IFAS, CA countries
Timeline for implementation: 2019-2020
Kazakhstan
- Enabling Environment
Action 44 - Harmonization of legislation, indicators and standards of water quality in Central Asian countries; protection and development of water protection areas
IWRM Dimension:
Enabling Environment
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, 16. Peace, justice and strong institutions
Responsible Agency: Commission on sustainable development, CA countries
Timeline for implementation: 2019-2025
SDG 6.5.1 Question: 1.2c. Transboundary arrangements
Level: Transboundary
Status of action: Underway
Related SDG Goal: - 6.5 Integrated water resources management & transboundary cooperation, 16. Peace, justice and strong institutions
Responsible Agency: Commission on sustainable development, CA countries
Timeline for implementation: 2019-2025