GWP Knowledge search

Sort by: Relevance | Date

Latest publications

/ Case studies / English

Transboundary: Adaptation to climate change in the countries of the Lower Mekong Basin (#385)

There are growing concerns about the potential effects of climate change on the socio-economic characteristics and natural resources of the Lower Mekong Basin. In response to the potential impacts of climate change, the Mekong River Commission has launched the regional Climate Change and Adaptation Initiative. Furthermore, a Vulnerability and Adaptation Assessment has been conducted. The most important lesson learnt is that it is essential to establish a regional organisation to combat climate change. 

/ Case studies / English

Thailand: Partnership policy in Songkhla Lake (#269)

The most pressing problem facing the Songkhla Lake Basin is land degradation and water pollution caused by land use changes and shrimp farming expansion. Action was taken to combat these issues and an Integrated Environmental Management approach was applied. The key lesson of this case is that replacing blueprint master planning approaches with process oriented planning frameworks increased sustainability significantly.

/ Case studies / English

Myanmar: Water licensing & strengthening of water user groups (#310)

To increase agricultural productivity, the Ministry of Agriculture and Irrigation has encouraged many farmers to organise water users groups. Yields are to be increased through the collaborative and efficient participation of beneficiary farmers engaged in irrigation. This has led to efficient water distribution throughout the managed watercourse. The most important lesson learnt is the importance of the strengthening of each water user group. 

/ Case studies / English

Malaysia: Managing the Kinabatangan floodplains in Sabah (#256)

Clearing for logging, combined with expanding agriculture and palm oil plantations has led to increased flooding, and pollution of the Kinabatangan River due to pesticides and fertilizers. Working in partnership, the Sabah Wildlife Department and the WWF took action and have established the Lower Kinabatangan Wildlife Sanctuary. The key lesson of this case is the value of starting with small-scale feasible projects before scaling up. 

/ Case studies / English

Malaysia: Community and non-governmental organisation partnership in highland catchment management (#174)

The district of Cameron Highlands is subjected to a range of environmental problems, ranging from landslides, mudslides, erosion, siltation to water woes. Action was taken by the WWF advocating sustainable highland development to safeguard Cameron Highlands’ delicate ecosystem. Furthermore, through community initiative, the Regional Environmental Awareness of Cameron Highlands was created. This case highlights the value of cooperation between NGOs and community initiatives.

/ Case studies / English

Lao PDR: Water Planning and Economic Development (#408)

The development of hydropower in the Mekong River basin can bring great economic opportunities for Laos. However, since this basin is shared with neighbouring countries, cooperation is crucial. Action was taken and the Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin was signed to coordinate the use of these resources for economic development. For Laos, this has been crucial to their success in regards to the MDGs. 

/ Case studies / English

Indonesia: A watershed approach to coastal zone management in Balikpapan Bay (#85)

To improve the state of the Balikpapan Bay coastal ecosystem, a coastal zone management project was initiated. After initial project failure, action was taken for policy reform and an adaptive management approach was developed, focusing on inter-agency integration. This case illustrates the importance of active project learning and adaptive management. 

/ Case studies / English

India: Social side-effects of the Upper Veda Dam Project (#308)

The Upper Veda Project involves a dam that would submerge 14 villages. Opposing the project, the affected communities took action and urged for alternative solutions. The dam was eventually constructed, but the process was characterised by conflicts between the project authorities and the communities. This case illustrates that dam projects, which directly affect the livelihoods of large numbers of people, need to have developed a well defined rehabilitation plan prior to construction. 

/ Case studies / English

India: Integrated management of Chilika Lagoon (#268)

The Chilika Lagoon was subjected to environmental degradation. Action was taken by the Chilika Development Authority through the application of GIS and remote sensing tools for monitoring and assessment of the lagoon, resulting in significant improvement of the ecological health of the lagoon. The key lesson learnt is how a clear understanding of the coastal process and the river basin is essential for restoration of a coastal wetland.