Search

Sort by: Relevance | Date
/ English

Mekrou Project in Burkina, reducing conflicts is an important asset for development

Mr. COMBARI Diadonné Amidou, the mayor of Matiacoali is very enthusiastic with the material delimitation of the route for the cattle transiting from Niger to Benin. Every year the transhumance creates lots of conflicts between cattle breeders and farmers leading at time loss of life. The Prefect of Matiacoali is more specific on “the issue of conflicts between these two groups is a crucial reality in this area. The tribunal of the department has registered an average number of 18 conflicts between August 18 when I started service here and December 2016. The delimitation of these corridors for the benefit of the population will contribute to reduce drastically the conflicts”.
/ English

Mekrou Project in Niger, a water reservoir in the W Park for wild animals to reduce poverty

The Country Water Partnership (CWP) of Niger in partnership with the Ministry of Environment, urban sanitation and sustainable development through the directorate of wildlife, hunting and protected areas is building a water reservoir for the wildlife of the W Park. The stock of 200 hundred thousand hectares has 30 water reservoirs of which only four are permanent i.e. they don’t totally dry up during the long dry hot season.
/ English

La Necesidad de un Enfoque Integrado

Ese enfoque integrado se denomina Gestión Integrada de los Recursos Hídricos (GIRH) y se define como un proceso que proceso que promueve la gestión y desarrollo coordinado del agua, la tierra y los recursos relacionados, con el fin de maximizar el bienestar social y económico resultante de manera equitativa, sin comprometer la sostenibilidad de los ecosistemas.
/ English

THEMES

GWP-Central Africa (GWP-CAf) works across different themes in line with the global GWP strategy 2020-2025.
/ English

DriDanube

DriDanube (Drought Risk in the Danube Region) project is a 30-month project which started on 1 January 2017 within INTERREG’s Danube Transnational Programme.
/ English

CHANGE AND IMPACT

Our six-year strategy, from 2014 to the end of 2019, provides an innovative response to the emerging challenges of our network.
/ English

Regional Resources

The regional resources listed on this page are produced or peer reviewed by GWPSA Programme and Communications Team
/ English

Programme / Project Briefs

The GWPSA programme and Project Briefs provide insights on the various Programme and Projects that GWPSA is implimenting or has implemented . The programmes are listed below: